Location
Havant, Hampshire

Architects
Boyle+Summers

Client
Portsmouth Water

Info
£9m, 4190sqm GIA, 2 storey office HQ as part of a feasibility study + masterplan for the clients new campus. The proposed design includes new open plan office areas, meeting areas, technical, research + laboratory areas, focused on integrated working arrangements, bringing all the functions of the clients business under one roof.

Status
Currently unrealised

Role
Part II Architectural Assistant - RIBA work stages 2-3

Responsibility
Stage 2 planning drawings  + representation in Revit
Internal redesign + building alterations (2017)
CGI Perspective - Site Entrance
CGI Perspective - Site Entrance
Proposed Site Plan
Proposed Site Plan
Proposed Ground Floor Layout - Partial 1 of 2
Proposed Ground Floor Layout - Partial 1 of 2
Proposed First Floor Layout
Proposed First Floor Layout
Proposed Roof Layout
Proposed Roof Layout
Typical Long Sections
Typical Long Sections
Typical Cross Sections
Typical Cross Sections
Proposed North (top) + East (bottom) Elevations
Proposed North (top) + East (bottom) Elevations
Proposed South (top) + West (bottom) Elevations
Proposed South (top) + West (bottom) Elevations
Back to Top